3D Panel Construction Sample:

Due to their lightweight, one of the best features of the Three Dee Panels is that they can easily be set in place or stacked using only one or two persons. A standard panel with the dimension of 1.2x3.00 m has a weight of approximately 18 kg, which gives an idea how easy handling and installing this system.

   
Step 1
3D installation starts from the concrete slab, either a conventional flooring system. Re-starter bars are “cast into the slab” according to engineering requirements.
 
Step 2
Cutting and assembling of the 3D panels is carried out according to the engineering shop drawings and cutting schedule. The 3D lightweight panels are easily assembled forming the wall structure.
 
Step 3
Erection of the 3D panels starts in a corner to give the construction rigidity. The panels are tied together with a lap (splice) mesh on both sides using a pneumatic fastener tool (hog ring gun).
   
Step 4
The panels are held in place using appropriate bracing. The type of bracing required will depend on site conditions. All bracing is located on the same side of the wall, opposite to the side which will receive the concrete first.
 
Step 5
Openings for doors and windows can be cut out before or after the panels are erected. Pre-cast lightweight concrete reveals are inserted into the openings providing extra screed lines for plastering and a pre-finished return surface to fix the windows to.
 
Step 6
3D panels can be used for mid-flooring and roof structures, using a simple connection system. Many other conventional concrete or timber flooring systems can also be incorporated into the 3D concrete wall structure.
   
Step 7
Before concrete application, all services such as electrical and reinforcing mesh. Once all bracing and screed lines plumbing, gas etc. are placed between the polystyrene are in place, the walls are sprayed with a special concrete mix and completed to the desired finish.
 
Step 8
There are various finishes available including sponge, smooth undulating (adobe), drag or trowelled. For internal walls, if a gib (gybrok/plaster board) finish is preferred, the walls are simply straight-edged and the gib is glued directly to it. The exterior is painted with an elastomeric acrylic paint system.
 
Step 9
The finished product picture
 
 